Complete Installation Solution for Crysalli UC Ice Systems
Streamline your ice machine setup with a ready‑to‑install kit that reduces labor time and ensures reliable performance.
Key Features
- Includes 5 ft of CR‑4L38 trunkline and all required fittings to connect the Draft tower to the CR‑UC# chiller.
- Supplies LBS‑10JG leak block sensor plus 8 JG 90 3/8" smooth‑to‑3/8" PP221212W fittings for secure water inlet and filter connections.
- Provides Oetiger clamps (10.5 mm, 12.3 mm, 15.7 mm) and Armaflex tape/sleeve for professional‑grade tubing insulation.
- Contains extra 3/8" and 1/4" tubing, zip ties, and adapters to accommodate filter system inlet/outlet and optional CO₂ or drain lines.
From The Manufacturer
Installation Kit, includes: LBS-10JG leak block sensor, 5 ft of CR-4L38 trunkline, various fittings and oetiker clamps, extra tubing and insulation to install the filter system, CR-UCM# and CBR or CM tower, for models: CR-UCM1, CR-UCM2, CR-UCM2-2CL, CR-UCM2-S0096, CR-UCM2-2CL-S0096





